Tata Steel has signed a connection offer with the Electricity System Operator that involves National Grid building new infrastructure to be able to power the largest UK steelmaker’s new 2.3 million mt electric arc furnace by the end of 2027, it said May 20. This would be an important milestone for Tata Steel UK in ...
↧